Transportation, Fabrication, and Installation of 6 Petroleum Coke Storage Silos

2025/12/14

Transportation, Fabrication, and Installation of 6 Petroleum Coke Storage Silos

Units 301 and 401

Project Description:

Receiving and transporting materials from the employer’s warehouse, unloading at the installation site, fabrication, assembly and welding (complete installation), testing, sandblasting, and painting of 6 petroleum coke storage silos (tanks) related to Units 301 and 401 at the Carbon Anode Production Site of Amirkabir Carbon Industry (Kheirabad Site).


Names of Silos (Tanks):

  • Unit 301 Tanks:

    Two tanks with a diameter of 24 meters

  • Unit 401 Tanks:

    Two tanks with a diameter of 16 meters

  • Unit 401 Tanks:

    Two tanks with a diameter of 8 meters


Approximate Project Weight:

1,500 tons


Contract Details:

  • Contract No.: MCST-301, 401
  • Contract Duration: 7 solar months, equivalent to 210 days
  • Contract Amount: 948,584,000,000 IRR

Employer:

Amirkabir Carbon Industry Company

Managing Director: Mr. Engineer Ghaffari

Tel: +98 86 33126970


Project Location:

Kheirabad Industrial Town – Amirkabir Carbon Industry Site